Skip to content
Fischlin Reinigungen Schweiz GmbH
Empty, bright flat with kitchen and parquet floor

Construction cleaning in the Zug region

From the dust of the building phase to a ready-to-occupy handover: we take on interim and final construction cleaning for new builds and renovations in the Zug region, for general contractors and private clients.

  • Family business since 1969
  • Zug region and surroundings
  • Quote within 24 hours
  • 4.8

Interim construction cleaning

During the building phase we clear and clean so that the following trades can work on a clean base:

  • Coarse dirt
  • Leftover construction debris
  • Dust on floors and surfaces

Final construction cleaning

Before the handover we clean the property until it is ready to occupy:

  • Floors
  • Windows including frames
  • Sanitary facilities
  • Kitchens
  • Surfaces

Quote according to BKP 287

We quote construction cleaning individually according to item BKP 287 of the Swiss construction cost plan. You receive the quote within 24 hours.

Request a quote

What BKP 287 means

BKP stands for Baukostenplan, the construction cost plan published by CRB, which structures the costs of a building project in Switzerland. Item 287 covers construction cleaning. General contractors and building owners tender the cleaning under this item because all bidders then price the same service and the quotes can be compared directly. The cleaning is also clearly assigned in the cost plan and shown separately from the other trades, which makes it easier to keep track of costs during construction.

Who construction cleaning is for

  • General contractors and construction firmsBefore the building acceptance, time pressure is often high, and cleaning is among the last jobs on site.
  • Private clients after a conversion or renovationAfter the building work, cleaning is best done before the furniture comes back, because fine dust often covers every surface.

If it is about cleaning when moving out, with no building work beforehand, move-out cleaning is the right service.

How to prepare for construction cleaning

For the cleaning to run smoothly, it is advisable to include these points early in your building schedule:

  • Access to the propertyClarify when and how the cleaning team gets into the property, for example with a key or a site access arrangement.
  • Water and electricityBoth should be available on site so that cleaning equipment and products can be used without detours.
  • Coarse building wasteIdeally, the tradespeople have already removed their coarse waste and materials.
  • DatePlan the final cleaning after the last trade visit and before the handover or move-in, so that the cleaned surfaces stay clean.

How construction cleaning works

  1. Enquiry

    Key details on the property, location, building phase and dates.

  2. Clarification

    Scope, dates and special features.

  3. Quote

    According to BKP 287, within 24 hours.

  4. Cleaning

    Interim or final cleaning as agreed.

A quote for your construction cleaning

We are here for you throughout the canton of Zug and in the neighbouring municipalities. Tell us briefly what it is about, and we will get back to you with a transparent quote.

Kundenversprechen quality seal of the Schweizerischer Konsumentenbund

Certified customer promise: we commit to fairness, quality and honest advice, in line with the code of honour of the Schweizerischer Konsumentenbund.

Verify certificate

Frequently asked questions about construction cleaning

What is the difference between interim and final construction cleaning?

Interim cleaning takes place during the building phase: coarse dirt, leftover debris and dust are removed so that the following trades can work on a clean base. Final cleaning follows before the handover and makes the property ready to occupy.

When should the final construction cleaning take place?

After the last trade visit and before the building acceptance or move-in. That way the cleaned surfaces stay clean, because no further work follows.

Do you quote according to BKP?

Yes, according to item BKP 287. You receive the quote within 24 hours.

What does the final construction cleaning include?

The final cleaning covers floors, windows including frames, sanitary facilities, kitchens and surfaces. The exact scope is set out in the quote.

Do you also take on smaller renovation cleaning for private clients?

Yes. We also take on the cleaning for private clients after a conversion or a smaller renovation. The scope is set out in the quote.

What is the difference from move-out cleaning?

Move-out cleaning is for handing over a flat or office when moving out, and the handover guarantee is included in the standard price. Construction cleaning removes building dust and dirt after building work, and we prepare the quote according to BKP 287.

Your question isn't here? Write to us.